Create an assignment as an operator
Use these steps when an advertiser cannot complete assignment creation or when you are entering the request for them. The saved assignment starts as Pending.- Open the Inventory Assignment tab on the Promotion banner line item’s detail page and select Add inventory assignment.
- Select AdUnit or Placement, then search for and select an active target. For a Placement, confirm it includes an active AdUnit.
- Under Delivery Settings, choose the Impression Tracking Mode. Choose On Impression Event only when the client tracker is integrated. If needed, configure Frequency Capping rules and Limit Multiple Clicks. Add the reason or advertiser’s request under Comment.
- For a direct ad type, select Add assignment to save. Verify that the new assignment is Pending.
Network ad types have additional ad source settings, but these do not replace a linked creative. Publishing also requires an active creative link and an active creative for network ad types.The current console does not show creative-link controls for network Line Items. Before proceeding with delivery, ask the A2 administrator or support contact how to handle the required link.

1. Find a request
- Open Allocation Approval.
- Select the Requested status.
- Search for
Promotion banner. - Review the line item, target, advertiser, latest comment, and update time in the row. Open the details for more allocation information.

2. Check before publishing
Publishing requires an active creative and an active creative link. If a creative is only registered, ask the advertiser to link and activate it first. See Creative types.
Review Delivery Settings on the allocation’s detail or edit screen. Check the fields shown there, such as ad log tracking, frequency limits, and ad source settings. Advertisers cannot change these operational settings; the reviewer manages them.
3. Publish or reject the request
To publish
- Select Publish in the requested allocation’s Status Action column.
- In the confirmation dialog, add a comment if needed and confirm the status change.
- Verify that the allocation status changes to Published.

To reject and request changes
- Select Reject in the Status Action column.
- Explain what needs to change and why. For example:
Please link and activate a 300×250 creative supported by Home top banner, then request approval again. - Confirm and verify that the status changes to Rejected.
Cancel or finish a published allocation
- Finish cannot be undone, so confirm that delivery is complete first.
- Only Pending allocations can be deleted.
